Aitch Group
Royal Borough of Greenwich
189 Homes
250M
Planning Approved 2022
Aitch Group
No items found.

Project Details

Client
Aitch Group
Local Authority
Royal Borough of Greenwich
Construction Cost
250M
Status
Planning Approved 2022

The  redevelopment of 61-81 Eastmoor Street will regenerate 0.592 hectares of the Charlton Riverside Estate and provide of 1800m2 of commercial space and 202 new homes. The delivery of this site will act as a catalyst to drive  inclusive, sustainable development in the area. The proposal is split into two separate blocks, varying between 6 to ten storeys. Dividing the blocks East to West is the landscaped Penhall Gardens, becoming a key section in the future green link specified in the SPD and providing generous amenity space linking the area to Moore Park; to the South a green yard is shared with an adjacent Evelyn House scheme.

These two new routes boost the wider contexts relationship to the park through the creation of views, utilizing a great asset of the local area. As part of the development Eastmoor Street will be appropriated into Moore Park to create a seamless boundary between the two spaces. A one way road will be in operation to allow for emergency traffic, but the ownership of the space will be firmly in the hands of the pedestrian and cyclist and encourage a healthy,  sustainable use of the area.. A revised application was approved 2023 which included for additional fire cores.